Announcement about hydraulic testing of heating main DU1000

For the attention of the population, managers of enterprises and organizations of Almaty:

On June 22, 2023, from 06:00 to 07:00, a repeated hydraulic test of the Du1000 heating main from CHPP-2 named after. A. Zhakutov address: Almaty, Alatau district, Algabas microdistrict, street 7, building 130 to the Central heat distribution point of ZTK AlES JSC address: Almaty, Auezovsky district, Tole Bi street, building 308.

In this regard, AlES JSC asks all residents in the area of ​​the test (Algabas microdistrict, Aksayskaya St., Margulan St., Trudovaya St., Altyn Besik microdistrict, Aksai 3 microdistrict, Aksai 3A microdistrict , microdistrict “Aksai 3B”, microdistrict “Aksai 2”, Saina street (between Tole bi street and Kabdolova street), area west of the Central International Bus Station “Sairan” (between Saina street and Otegen Batyr street) safety rules, be careful to avoid serious injury in case of possible damage to the heating main.

Managers of enterprises and organizations need to remove people from the area of ​​the heating main being tested to eliminate possible accidents.

Additional information can be obtained by phone. 8 (727) 227-70-21.

Zola’s second life

On June 16, 2023, an award ceremony took place for the winner of the competition for processing ash and slag waste at CHPP-2 named after. A. Zhakutova. The event was held with the participation of representatives of the Akimat of Almaty and the Department of Ecology of Almaty, the media, Arka Development LLP, Almaty Power Plants JSC.

Let us recall that on June 1, 2023, AlES JSC summed up the results of the competition to find scientific and technical projects for the processing and (or) disposal of ash and slag waste after hydraulic ash removal of Almaty CHPPs. Seven applications were received from potential participants, which were studied in detail by the competition commission. Which included representatives of the Akimat, the Department of Ecology in Almaty, technical specialists from scientific institutes and JSC AlES. Based on the results of consideration of proposals, Arka Development LLP was unanimously chosen as the winner of the competition.

The proposed project will make it possible to build, next to the Almaty CHPP-2, a complex for processing ash and slag waste, with an annual capacity of 300 thousand tons. As a result of processing ash and slag waste, four types of products will be obtained:

✓ underburned coal (briquetted product for boiler houses),
✓ magnetite (raw material for the metallurgical industry, filler for heavy concrete),
✓ microsphere (fillers in the production of plastic products, gypsum, ceramics, lightweight cement),
✓ aluminosilicate product (raw material for building materials).

According to the requirements of the current environmental legislation of the Republic of Kazakhstan, the share of waste recycling should be increased to 40% by 2030, and to 50% by 2050.

The implementation of this project will allow solving the problems of deep processing of ash and slag waste generated at Almaty thermal power plants, extracting up to 99% of useful elements from them, to reduce the area of ​​ash dumps, and then their complete reclamation.

During the event, a Memorandum on further cooperation between AlES JSC and Arka Development LLP was signed. AlES JSC awarded a certificate worth 1,000,000 tenge to the winner of the competition for the best proposal for processing ash and slag waste.

For reference:
Almaty Electric Power Stations JSC  (AlPP) is an energy producing organization operating in the production of thermal and electrical energy in the city of Almaty and the Almaty region. AlPP provides electricity and heat to about 70% of consumers in the Almaty region. The company includes CHPP-1, CHPP-2, CHPP-3, Western Thermal Complex, Kapshagay HPP, Almaty HPP Cascade, PTO Energoremont, CPVT.

The Asian Development Bank will finance the construction of Almaty CHPP-2

Today in Astana, a Credit Agreement was signed between the Asian Development Bank (ADB) and Almaty Electric Power Plants JSC (AlPP), a company within the structure of the Kazakh electric power holding Samruk-Energo JSC. The document involves financing the project “Modernization of Almaty CHPP-2 with minimizing the impact on the environment,” work on which has now reached the stage of practical implementation.

The event was held with the participation of the Chairman of the Board of Samruk-Kazyna JSC Nurlan Zhakupov, ADB President Masatsugu Asakawa and the Chairman of the Board of Samruk-Energy JSC Serik Tyutebaev. The loan agreement for a total amount of 98 billion tenge was signed by the Chairman of the Board of AlES JSC Erlan Kirkinbaev and the Director of the Department for Private Sector Infrastructure Projects in South, Central and Western Asia of the ADB Shantanu Chakraborty.

For AlES JSC, the owner of Almaty CHPP-2, ADB became the third financial partner with whom a Loan Agreement was concluded as part of the project. Previously, relevant agreements for financing the construction of a new gas station in Almaty on a site next to the old CHPP-2 were concluded with the European Bank for Reconstruction and Development (EBRD) and the Development Bank of Kazakhstan (DBK).

According to the head of AlES Erlan Kirkinbaev, the signing of a loan agreement with the ADB finally resolves all issues related to financing the project. The station will be completely converted to natural gas and will stop using coal as fuel.

The project to modernize and convert Almaty CHPP-2 to gas fuel is being implemented with the support of Samruk-Kazyna Fund JSC. As part of the event to sign a loan agreement between AlES and ADB, a Guarantee Agreement was signed between Samruk-Kazyna JSC and ADB. According to specialists from the Kazakhstan Fund, the signed document helps to minimize risks and improve the terms of lending for the project.

Let us recall that earlier, following the results of a two-stage open international tender in accordance with international standards and rules of the EBRD, a contractor for the construction of a new gas turbine thermal power plant was selected – a consortium of three large Chinese companies specializing in the implementation of energy projects. At the end of May of the current code, AlES JSC concluded an EPC contract with the winner of the competition to perform a full cycle of work – design, supply of equipment, construction, installation and commissioning, commissioning.

In addition to the modernization of Almaty CHPP-2, the portfolio of AlPP projects includes the construction of a gas station with a combined cycle capacity of 545 MW on the territory of Almaty CHPP-3, reconstruction of Almaty CHPP-1 with the construction of a combined cycle plant with a capacity of up to 250 MW. In addition, we have begun developing projects for the modernization of the Kapshagai hydroelectric power station with the construction of a counter-regulator on the Ile River and the reconstruction of the Cascade hydroelectric power station.

The implementation of these projects, along with other measures, will significantly improve the air basin of Almaty and the Almaty agglomeration, ensure sustainable heat and energy supply, as well as economic development of the region. Ultimately, Almaty Electric Stations JSC will become one of the largest energy companies in the country, completely reoriented towards the development of “green energy”.

Sport is the norm of life

More than 400 athletes from 9 production departments of AlES JSC took part in the corporate sports competition
At the end of May, the Spartakiad between departments was held at AlES JSC. It was held as part of participation in the qualifying competition stage of Samruk-Energy JSC. The Spartakiad started with the opening ceremony of the games at the stadium of the Kazakh Academy of Sports and Tourism.

The participants were congratulated on the start of the competition by Erlan Kirkinbaev, Chairman of the Board of AlES JSC, Serik Tymbaspaev, Chairman of the Local Trade Union “Energy”, and Alibek Tastanbekov, Director of CHPP-1 named after B. Orazbayev.

– The corporate sports event is held to promote a healthy lifestyle and sports among the campaign’s employees. I am glad that athletes and enterprise workers here unite into a single whole and go to their awards. I wish everyone a good start and feel like winners,” noted Erlan Kirkinbaev, Chairman of the Board.

The Spartakiad was held in ten sports – mini-football, volleyball, basketball, arcan tartu, asyk atu, arm wrestling, togyz kumalak, chess, table tennis and e-sports (CS:GO). More than 400 athletes from 9 departments took part in the event.

The curtain of the competition was opened with a spectacular game of football. The teams that heated up the football competition did not want to easily give up the main race of the competition. But in sports there will only be one winner.

– In the final, a serious fight broke out between the strongest football teams of CHPP-2 and CHPP-3. The team of CHPP-2 won,” explained Erkebulan Bayanbai, senior foreman of the electrical machine shop at the Kapshagai HPP named after. Sh. Chokina. – Football is a team sport, and the result of participation in competitions is the result of everyone’s collective efforts. Thank you to all teams for participating in the competition, we wish you good health and new sporting achievements!

Aidyn Suanbekov, a boiler cleaner at PRP Energoremont, began playing football at a young age. Football is a part of his life. Football is everything for the Suanbekov dynasty. She always plays for the PRP and AlES teams.

– I got a job at AlES in 2011. From that time until now I have been playing football with passion. My first sports day at Samruk-Energy JSC was in 2013, then we took 1st place. I was so proud! After that, every year we took prizes, and were always leaders among the group of companies of Samuryk-Kazyna JSC,” shared Aidyn Suanbekov. I’ve been playing professionally since 2002. He played in the First League of Kazakhstan “Ile-Saulet”. Now I play for the regional team. My goal is to score a goal in every game and become a champion! I don’t regret getting a job as a boiler cleaner. I’m an energy football player. It is a great honor for me to be a power engineer and to play for the AlES JSC team.

Bakhtiyar Yesenaly, a programmer engineer at ZTK, believes that the Spartakiad was held perfectly. He especially liked the fact that the selection of participants for the AlES basketball team was carried out with the help of the head coach of KazAST. This transparency and objectivity suited all the participants of the Spartakiad.

– Sports competitions helped our athletes develop agility, strength, endurance, and the ability to overcome difficulties. We have united into one whole, one family,” said Kanat Azimkhanov, leading engineer of the electrical laboratory of CHPP-3.

Chief specialist of the thermal automation and measurement workshop of TPP-1 named after. B. Orazbayev Baurzhan Bekturov is confident that participation in the Olympics is very important for all athletes among AlES employees.

– Winning the Spartakiad is very honorable because the strongest take part. In the first (arkan tartu) match, our opponents were the guys from CHPP-3. The first fight always turns out “lumpy”; the loss was an incentive to prepare for the next fight with PRP. But luck didn’t smile on us there either. We felt the advantage of our opponents, but on the whole the rest of the matches were successful, and our refereeing at the Spartakiad was excellent. We fought against the ZTK team to reach the finals, defeating them in the semi-finals and came in second place,” said Baurzhan.

According to Aktan Abylaikhan, engineer of the Repair Service of CHPP-1 named after. B. Orazbayev’s Spartakiad was held at a high level. Each team gave their 100%. This is not the first Olympics for him; he participated in the eSports discipline.

According to the results of the sports competition, the team of TPP-3 was recognized as the strongest (4 gold, 5 silver, 2 bronze). In second place is the team of the PRP “Energoremont” (3-gold, 2-silver, 4-bronze). The honorable third place went to CHPP-2 named after. A. Zhakutova (2-gold, 2-silver, 3-bronze).

– CHPP-3 received the overall team 1st place. This is an excellent result for us. In a short period of time, team captain Kanat Azimkhanov gathered the station’s best players in all sports. During the lunch break and in their free time from work, the guys trained to develop a unified team spirit and teamwork,” Galina Gorbovskaya, head of the HR department at CHPP-3, proudly said. – We had strong teams in football and volleyball. The most spectacular competition is in eSports. We took 1st place. We hope that the beginning of sports victories will give a positive result and an impetus for young people to take up sports. The team at CHPP-3 is proud of its athletes. We wish you new victories in Borovoye!

 

The AlES Spartakiad was very interesting and bright, with sporting enthusiasm, noisy and very fun. Cascade HPP fans received great pleasure and a lot of impressions from this event. This is a very important and necessary event, not only as a physical education and health event, but also as a spiritual, interesting event for the Cascade HPP team! – shared Gulnaz Merembay, metrology engineer at Cascade HPP. On behalf of the fans, we express our gratitude to all participants for their cheerful mood, sports spirit and caring attitude, and to the organizers for an interesting event full of positive emotions.

Based on the results of the corporate sports competition, the AlES team was formed, consisting of 62 employees in 10 sports. The team will take part in the sports competitions of Samruk-Energy JSC.

The event took place with the support of the Local Trade Union “Energy”.

JSC “AlES”: in 3 hours twenty 160 liter bags of garbage were collected on the river. Checkpoint

At the beginning of June, the company’s ecologists held an eco-landing party to collect garbage “#Өzende қokyska oryn zhok”

In Kazakhstan, June 5 is a professional holiday – Ecologist’s Day. This date was approved in Kazakhstan by presidential decree in 2011.

For the third year now, environmentalists at AlES JSC have been holding a field campaign on the Prokhodnaya River in the Alma-Arasan Gorge.

Man is the creator of his environment, which ensures not only his physical existence, but also provides him with opportunities for intellectual, moral, social and spiritual development.

“We were depressed by the sight of the Prokhodnaya River, bags of garbage, plastic cups, bags and plates, broken glass. We call this “Gifts of Civilization”. There is a lot of plastic, given that the average decomposition time of plastic products ranges from 80 to 700 years, the main concerns are that plastic, when it gets into the ground, breaks down into small particles and can release chemicals added to them during production into the environment ,” Saltanat Zhanakhmetova, chief specialist of the Environmental Protection Department, expressed her concern. “It’s painful and unpleasant to watch.” People, unfortunately, do not think about their actions and the fact that the river is the wealth of our world.

– The expected result of the field event is that we want to attract the attention of Almaty residents and the public to environmental issues and the condition of the river. Having cleared the bed of the Prokhodnaya River, we did not stop there; we increased the area being cleaned: we went up to the GES-5 dam, where we also cleaned the river bed. What we saw amazed us – how carelessly and unscrupulously people treat nature. The garbage is thrown out directly in bags, although the walk to the garbage containers is not far at all. As a result of the action, the eco-troopers   collected  twenty 160 liter bags of garbage in 3 hours ,  ” Elena Silvestrova, chief specialist of the Environmental Protection Department, shared her opinion.

– The harm caused by plastic waste is much greater than it might seem at first glance. At the same time, more and more plastic is produced every year; according to official data, more plastic has been produced in the last decade than in the last hundred years. This creates a truly huge problem that affects the planet from all sides.

“If people don’t stop using single-use plastics such as plastic bags and plastic bottles, by 2050 there will be more plastic in the world’s oceans than fish,” say the United Nations Environment Program (UNEP).

How can we help? It is enough for each person to reconsider his habits a little:

– try not to use plastic bags. You can go to the store with a cloth grocery bag and wrap your food in paper bags;
– do not use disposable plastic tableware;
– do not buy water in plastic bottles, get a reusable container and carry it with you or take a thermos with hot drinks.

Let’s not forget the words of the French geographer and sociologist Jean-Jacques Elisée Reclus: “rivers carry on their waves the history and life of peoples.” AlES environmentalists urge people to keep them clean so that the rivers continue to bring history and life to everything on Earth.

A contract was signed with the contractor for the construction of Almaty CHPP-2

On May 31, 2023, in Almaty, an agreement was signed with the contractor for the construction of the new Almaty CHPP-2 using gas fuel. An EPC contract implies the implementation of a full cycle of work – design, supply of equipment, construction, installation and commissioning works, commissioning. The new station will be built on the site of an existing thermal power plant, where today coal is used as the main fuel, and fuel oil is used as the starting fuel.

The contractor for the construction of the new gas turbine thermal power plant was a consortium of three large Chinese companies specializing in the implementation of energy projects: Dongfang Electric International Corporation, Powerchina Sepco1 Electric Power Construction Co., Ltd, Powerchina Hebei Electric Power Engineering Co. , Ltd.” The consortium is a union of companies, the first of which is a large manufacturer of industrial equipment, the second has experience in implementing projects under EPC conditions, and the third specializes in design.

This choice was determined by the results of a two-stage open international tender in accordance with international standards and rules of the European Bank for Reconstruction and Development (EBRD) within the framework of the project “Modernization of Almaty CHPP-2 with minimizing the impact on the environment.” Let us remind you that the tender for identifying an EPC contractor was announced in October last year. In January 2023, applications from participants in the 1st stage of the competition (qualification selection) were opened. In total, applications were received from 6 participants. As part of the 2nd stage of the tender, two applications were considered. As a result, according to the rules of the EBRD, the competition is considered valid and the bank at the end of May 2023 confirmed its winner – a consortium of three Chinese companies.

The signing of the EPC contract took place on the territory of Almaty CHPP-2, on the site allocated for the new station. The event was held with the participation of representatives of the Samruk-Kazyna Foundation, Maslikhat of Almaty, the Consulate General of the People’s Republic of China in Almaty, and Samruk-Energy JSC. The contract was signed by the Chairman of the Board of Almaty Electric Stations JSC (AlPP) Erlan Kirkinbaev on the customer’s side, and Mr. Jiang Lixiang, Deputy General Director of the International Marketing Department of Dongfang Electric International Corporation, on the contractor’s side.

According to the modernization project of Almaty CHPP-2, the construction of a gas-turbine CHPP with an electrical capacity of up to 600 MW and a thermal capacity of 957 Gcal/h is provided. The station will include a housing of gas turbine units and a hot water boiler house. The goal of the project is to reduce the negative impact of the station on the environmental situation of the city of Almaty by converting CHPP-2 to burning natural gas. Completion of the project and commissioning of the station is planned for December 2026.

According to experts from Samruk-Energy JSC, after modernization, reconstruction and switching to gas of two Almaty stations – CHPP-2 and CHPP-3, emissions of harmful substances into the city’s atmosphere will be reduced by 92%. The reduction will be achieved through the use of natural gas in efficient gas turbine units that ensure emissions of harmful substances into the atmosphere at the level of European Union requirements. In addition, as a result of replacing the main fuel coal with gas, the formation and disposal of ash and slag waste is eliminated. In place of the existing ash dump, evaporation fields are provided for the disposal of industrial wastewater.

Also, according to specialists from Samruk-Energy JSC, the project is aimed at covering the shortage of the electric power market in the southern zone of Kazakhstan.

In November 2022, a Loan Agreement was concluded between AlES, the owner of the station, and the EBRD to finance the project. In general, financial support for the project will be provided by international and Kazakh financial institutions, which, in addition to the EBRD, include the Asian Development Bank (ADB) and Development Bank of Kazakhstan JSC (DBK). The signing of relevant documents with ADB and DBK is planned for June 2023. Financing is provided under corporate guarantees of the Samruk-Kazyna Fund, which, according to experts, helps to minimize risks and improve lending conditions.

Labor safety comes first

Every year AlES JSC holds corporate events dedicated to World Occupational Safety and Health Day. This year, on April 28, a visiting meeting of safety and labor protection workers from all production departments was held at the Cascade HPP. The results for 2022 were summed up and tasks for 2023 were considered.

The main result of the past year is that there were no production-related accidents in the company. Occupational safety and health services have carried out significant work to improve the safety culture and employee involvement in occupational safety and health issues.

At the meeting, a report was presented on the work plans of the Department of Industrial Safety and Labor Protection with consideration of the results of activities approved by Samruk-Energy JSC and AlES JSC for 2022, said Karim Sartaev, head of the department. – All planned activities were completed in full and on time. Tasks for 2023 have been outlined.

– The review competition “The best organization of work on labor protection among the production departments of AlES JSC” is held annually in order to improve the labor protection management system, improve the organization and increase the efficiency of the safety and labor protection services of production departments, said Aisulu Irzhanova, chief specialist of the department.

The results of the competition were announced on World Occupational Safety and Health Day. The Occupational Safety and Health Service of CHPP-2 named after A. Zhakutov was recognized as the winner of the competition among production departments. They were awarded a Cup for the best organization of labor protection work, a certificate of honor and a cash prize. The second and third places were taken by the safety and labor protection services of CHPP-3 and TsPVT. They are rewarded with certificates of honor and cash prizes.

“We would like to draw attention to the fact that for the second year our company has taken first place in the competition dedicated to World Occupational Safety and Health Day among the subsidiaries and affiliates of Samruk-Energy JSC for the best video in the field of occupational safety and health,” continued Rasul Onalbaev, Managing Director on labor protection and environmental protection. Videos created by company personnel serve to disseminate and encourage positive experiences in the field of labor protection, strengthen the promotion of labor protection issues, awareness and involvement of workers.

Ensuring safe working conditions at every workplace has been and will always be the main priority in the activities of AlES JSC. The company is constantly working to improve the safety and health system.

The active and active participation of each employee in the implementation of new approaches to ensuring occupational safety and health, improving the safety culture in their production departments will ensure the achievement of AlES JSC, the Vision Zero goal set for 2023.

Videos can be viewed at  https://ales.kz/ru/component/nvideogallery/?view=nvideogallery

AlES: first not only in work, but also in creativity

The company’s video materials were recognized as the best in the competition of Samruk-Energy JSC in the field of occupational safety and health, dedicated to World Occupational Safety and Health Day

The Samruk-Energy JSC group of companies held a competition for the best creative event in the field of occupational safety and health, dedicated to World Occupational Safety and Health Day. At the end of May, the winners were awarded.

AlES provided four video materials for the competition. According to the results of the competition of Samruk-Energy JSC among subsidiaries and affiliates, the team of AlES JSC took 1st place for active participation, interesting stories, creativity and depth of presentation of the material.

Particularly noted was the video of the Kapshagai hydroelectric power station named after Sh. Chokin, which surprised the jury members with its colorfulness, dynamism and positivity.

– We shot our video on a single impulse, our youth are always easy-going. We are very friendly both in work and in such creative events,” shared Botagoz Salmakeeva, chief industrial safety specialist at the Kapshagai HPP named after Sh. Chokin.

The commission liked the video material of the production department of the Center for Technical Technologies. It reflects current topics of occupational safety; the video contains the entire plot of the film.

Nauryzbek Kuzenov, senior inspector for occupational health and safety, spoke about the creative process:

– Many employees usually remove trends from applications such as TikTok, Instagram, etc. I decided to show the process of unloading coal at the CHPP-3 site, where coal is unloaded manually by TsPVT workers. So that everyone who watches the video can understand how hard human labor produces electrical and thermal energy, what efforts our workers make to make every home light and warm! Despite hard work, every employee must return home safe and sound. We wanted to convey the entire work process through the camera. I really love my job and am glad that I work in the Occupational Safety and Health Service. I value every employee and with all my heart I want to wish us all trouble-free work, without injuries and accidents. I am sincerely grateful to Samruk-Energy JSC for holding such motivational competitions among its subsidiaries and affiliates.

The jury members were impressed by the video footage filmed by employees of the A. Zhakutov CHPP-2. This is an easy and creative video that reveals how workers live according to the “laws” of the modern world!

– It was very interesting for us to participate in such a competition. Thanks to the organizers for holding it. Thank you for highly appreciating our creativity,” continued Lyazzat Zhampozova, senior safety inspector at CHPP-2 named after A. Zhakutov.

The AlES team congratulates the winners of the competition and wishes them further success and achievements!

At AlES JSC, labor safety is a priority. A high safety culture and risk-oriented thinking among the company’s employees has always been and remains a priority.

Videos can be viewed at
https://ales.kz/ru/component/nvideogallery/?view=nvideogallery

Huge sky, bright sun and two chimneys of my CHPP-2…

I would depict on my banner Utemis Sabyrkulov, deputy chief engineer for repairs of CHPP-2 named after. A. Zhakutova

As a child, Utemis Sabyrkulov dreamed of different professions. And he chose the profession of energy engineer because he is sure that all industries and professions depend on and are strongly connected with energy.

In 1978, he became a student at the Almaty Energy Institute. According to Utemis Sabyrkulov, the energy profession is complex, multi-structural and in demand. The power engineer must have a mathematical mind, attentiveness, and monitor the accuracy of calculations. An energy specialist is a person capable of making decisions and bearing responsibility.

Utemis Sabyrkulov’s idol and mentor in the profession was his uncle, Honored Power Engineer of the Republic of Kazakhstan, CIS, academician, Professor Kezhek Bersenovich Iskakov, who made a great contribution to the development of the energy sector in Kazakhstan and trained a whole galaxy of power engineers.

At CHPP-2 named after. A. Zhakutov station Utemis Sabyrkulov has been operating since 1985. He began his career as an on-duty mechanic in a turbine shop, then worked as a lineman, a machinist, a senior driver, a shift supervisor, a deputy shop manager for operation, and from 2012 to the present he has been working as a deputy chief repair engineer.

“I remember my first working day at the station with a lot of equipment; I was struck by the enormity of the enterprise, the roar of engines, turbines, pumps,” recalls Utemis Sabyrkulov. – My first mentor was senior turbine shop operator Sergei Kirillovich Shadrin. He taught me a lot and helped me develop as a specialist. I got used to the station quite quickly, thanks to experienced mentors.

About 800 people work at CHPP-2. A lot of guys came from the Energy Institute, from college, and there are also guys from related professions. People from our station work as managers throughout Kazakhstan.

I met Utemis Abenovich in 1992, when I got a job at CHPP-2 as a line operator in the boiler shop. Then he worked as a boss
turbine shop. Over many years of working with him, I note that Utemis Abenovich
professional in his field. He is always disciplined and demanding
At work. As a person, he is very kind, cheerful, and will always help with a word.
and action, support and participation.

Kenzhebay Baizakhov, head of the fuel and transport department of CHPP-2

The main thing in work for Utemis Sabyrkulov is responsibility for his work, conscientiousness, never stopping there, and improving his professional level.

– I went from a mechanic to a deputy chief engineer. I have prepared decent personnel who will continue to work after me. Received the title of Honored Energy Engineer of the Republic of Kazakhstan. My professional dream is to work without accidents, without problems for people’s health. So that conscientious guys, professionals in their field, come into the energy sector.

Utemis Sabyrkulov’s working day begins with a tour of the station, then a daily planning meeting is held with the chief engineer of the station, where current matters on the repair and operation of the station equipment are discussed. Utemis Sabyrkulov always has everything planned and written down.

– Now is the time of technology and gadgets, and we need to keep up with the times. We must develop skills to succeed in the information age. Therefore, I am not only a mentor, but I also learn from the guys,” shared Utemis Sabyrkulov. – When I worked in the turbine shop, it was interesting to accept young guys, train them and see their success and growth. I have been working as a mentor for over 30 years. In the late 90s there was a time when salaries were paid in food, I was the deputy head of a turbine shop. Personnel turnover began and people began to leave for construction jobs, where the salaries were high. A whole shift, 15-16 people, left before the heating season. The situation was critical, but we were quickly able to recruit young, inexperienced guys, prepared, trained and successfully conducted the heating season.

He never claims to know everything. Always learn. The introduction of new equipment always brings new experiences to him.

Colleagues speak of Utemis Sabyrkulov as a very responsible employee. If you need it at three o’clock in the morning or on weekends, and even on vacation, then, if in the city, he will always come to the station to resolve serious work issues.

Utemis Abenovich is an attentive, demanding, caring person.
Delves deeply into the solution of any issues, pays attention to
details that seem insignificant, but are actually important.
Sometimes he asks a question, and you realize that you missed it (clicked!).

Eduard Doilido, shift supervisor at CHPP-2 power plant

– Our profession is considered one of the dangerous ones, because there is a risk of electric shock, a risk when working at height. You need to concentrate on the action being performed. The slightest mistake can lead to tragic consequences. Unfortunately, there have been such cases.

Utemis Sabyrkulov likes it when everything in the city, especially at night, is illuminated and beautiful. He is glad that this is the merit of our team. His motto in life: “No matter what happens, remember: it’s a bad day, not a bad life!”

The children of Utemis Sabyrkulov are proud of their father’s profession. And December 22 is a family holiday.

– On my banner I would depict a huge sky, a bright sun and two chimneys of my CHPP-2!

Utemis Sabyrkulov wishes trouble-free and uninterrupted work, health and patience to his colleagues in this complex profession that our city needs.

Adopt the best experience

At the beginning of May 2023, representatives of AlES JSC visited the production enterprises of Mosenergo PJSC

Projects for the construction of gas turbine units at CHPP-2 and CHPP-3 pose new challenges for the company’s personnel. Their practical implementation will begin in the second half of this year. To study the successful experience, the AlES delegation visited two stations of Mosenergo PJSC.

CHPP-27 is a new power plant in the system of PJSC Mosenergo. It is the same age as the Almaty CHPP-2, but more powerful. Its installed electrical capacity is 1,060 MW, and its installed thermal capacity is 1,876 Gcal/h. In 2005, a decision was made to further develop CHPP-27 based on the latest steam-gas cycle technology. In three years, two combined cycle power units with a capacity of 450 MW were built. Monitoring and control of technological processes of the third and fourth power units is carried out from a single central control panel.

CHPP-23 is the largest power plant of Mosenergo PJSC; it provides electricity and heat to more than 2 million people in the capital. The installed electrical capacity of the station is 1,420 MW, and the installed thermal capacity is 4,530 Gcal/h. The principle of its operation is similar to our CHPP-1, when it burned coal with the difference of a dust preparation system, instead of roller mills, ball drum mills were installed as at our CHPP-3.

“The station staff willingly shared questions about the operation and repair of CCGT units,” said Gaziy Ismukhambetov, “Managing Director for Production – Chief Engineer of AlES JSC.” – It turned out to be new for us that special attention needs to be paid to the quality of filters for air cleaning installations of gas turbines. For this purpose, a special incoming control was organized by the laboratory according to a methodology developed by order of Mosenergo PJSC. Siemens gas turbines have operated for more than 200 thousand hours; no defects or defects have been identified during this time.

Sergei Barmin, deputy chief engineer of CHPP-3, noted the high level of qualifications of the personnel, which ensures trouble-free operation.

– The process of putting the CCGT into operation for personnel took place in stages, starting with preliminary theoretical training, internship during commissioning and supervised operation with the participation of representatives of the manufacturer. This approach is used today in our company. Today we have the first stage – theoretical training,” continued Sergei Barmin.

The head of the Operations Department, Alexey Skryabin, liked the presence of a system for centralized repair of power equipment by his own department.

– This enterprise is technically equipped and has all the capabilities for high-quality repairs and mechanical processing of technologically complex units of power equipment. Mosenergo PJSC plans to organize a production cycle for gas turbine elements, the supply of which is difficult today. It should be noted that this unit is similar to our Energoremont PRP,” Alexey Skryabin shared his opinion.

Vladimir Sosnitsky, head of the technical maintenance department of the Western Thermal Complex, was surprised by the fuel warehouse of CHPP-23, the operation of which is fully automated. It is controlled using the mouse from the operator’s PC monitor.

AlES employees believe that the trip was a success; many questions were answered, clarified and clarified.

For reference: The PJSC operates 15 power plants with an installed electrical capacity of 12.6 thousand MW. Mosenergo also operates district and quarterly thermal stations and district heat and power supply stations. The installed thermal capacity of the company is 44.1 thousand Gcal/h. Power plants of Mosenergo PJSC supply over 50% of the electrical energy consumed in the Moscow region and provide about 90% of Moscow’s heat energy needs.