Implementation period: 2022-2026.
Installed capacity according to the feasibility study: electric power – 557 MW; heat power – 957 Gcal/h.
More detailsThe primary fuel is natural gas:
planned volume of consumption – 684.2 million m3/year.
Installed capacity:
electric power – up to 543.6 MW (ISO);
heat power – up to 160 Gcal/h.
Project “Expansion of CHPP-1 and construction of CCGT with a capacity of 200-250 MW”
Project “Reconstruction and modernization of the HPP Cascade of AlES JSC”
Project “Modernisation of Sh.Chokin Kapshagai HPP with construction of a counter-regulating hydropower plant on the Ile River”
More details