Goods Receiving and Unloading Centre: a Belgian influence and a safety net
When the Almaty power grid was acquired by Belgian investors in 1996, they set about reforming it. But of all the innovations introduced by the foreign investor, perhaps the creation of the Fuel Reception and Unloading Centre – in simple terms, the energy complex’s railway hub – is now viewed most positively at AlES JSC.
The relevant order was signed by the Belgians in 1998. However, as the power sector professionals themselves recall, the initiator of this structure was the chief engineer of “APK CHPP-2” JSC at the time – Nurlan Mukhamed-Rakhimov. Baktybek Sholanbaev was appointed as the first manager of the new department.

He took charge of drawing up the staffing structure, the budget and other organizational matters relating to the establishment of the Goods Receiving and Unloading Center (GRUC). Many people at the time understood the purpose and unique nature of the new department. The idea and aim were to transfer the sector’s non-energy-related functions to a separate unit staffed by specialists in the field.
This was due to the fact that, at the time of the GRUC’s founding, the technical condition of the railway tracks and traction rolling stock was in a deplorable state. The track gauge was widening due to the rotten wooden sleepers. The tracks were merely patched up, with metal ties installed to keep the gauge in line with the standard. Shunting locomotives frequently broke down, and staff had to be called in for overtime repair work. For all these reasons, the timely unloading of cargo was delayed, mainly on the CHPP-2 and CHPP-3 sections. The power engineers had to pay heavy penalties for the downtime of wagons waiting to be unloaded. Moreover, there were no professional railway specialists among the power sector staff who could deal with all these issues professionally and competently – after all, these are different sectors of the economy.

Once the specialist department had been established, many of these issues were quickly resolved, and dedicated funding was allocated. A separate budget was set up, allowing for a more targeted use of financial resources. In its very first year of operation, the Goods Receiving and Unloading Center (GRUC) managed to significantly reduce the accident rate, and derailments ceased. The company had all but forgotten about penalties for wagon downtime. The department proved its effectiveness in its first year of operation.

Although not all of its problems – including logistical and technical ones – were resolved immediately, the staff at the Central Production and Technical Department is particularly fond of recounting how they solved one of them: acquiring a new vehicle. It has become something of a local legend. In order to ensure operational oversight of repair work, compliance with safety regulations during operations, and the renewal of the vehicle fleet, the department submitted a letter to Valery Sauranovich Torlambayev, the General Manager of APK at the time, requesting that the purchase of new official vehicles be included in the budget. He jokingly replied that if the director jumps out of a plane with a parachute at the upcoming events organized by APK CJSC to mark the end of the heating season, the request would be granted.
We couldn’t get the director to take the dare. When our department was first established, we were provided with outdated cars and old buses. They gave Director Baktybek Tleukenovich an old ‘Volga’. At the time, Torlambayev was the general director of APK. He took us to the airfield in Bayserk for the holidays in May, where he jokingly said: Whoever wants a new company car, go ahead, jump!
That’s when Baktibek Tleukenovich jumped for the first time in his life. He was then given a car – a KIA. We went skydiving too afterwards, some as volunteers, others under voluntary compulsion…, recounted Kanat Shayzanov, Chief Engineer for Railway Operations.
It goes without saying that no one else was ever given a car as a reward for skydiving. But the fact remains that, over the years, the Goods Receiving and Unloading Center has become a fully-fledged, vital and indispensable department within AlES JSC, operating professionally and equipped to meet its objectives.