AN INCREASE IN THE TARIFF FOR THERMAL ENERGY PRODUCTION SERVICES.

“The Joint Stock Company” “Almaty electric stations “” will contribute to the introduction of tariffs for the production of thermal energy in the amount of 2,731.91 tenge/Gcal (without ECTS) until December 5, 2014, according to the Joint Order of the committee of departments for regulation the Ministry of national economy of the Republic of Kazakhstan for the city of Almaty from November 21, 2014 No. 64-OD and Almaty region from November 24, 2014 No. 50-od.

“JSC “”Almaty power plants “” informs consumers that from December 5, 2014, the tariff for heat energy production will be introduced in the amount of 2,731.91 tenge/Gcal (excluding VAT), approved by the Joint Order of the Department of the Committee for regulation of natural monopolies and protection of competition of the Ministry of national economy of the Republic of Kazakhstan in Almaty dated November 21, 2014 No. 64-OK and the Department for Almaty region dated November 24, 2014 No. 50-OK.”

CONVERSION OF CHP-1 TO NATURAL GAS COMBUSTION

2014-09-23 085256 smi

Public hearings on the project of expansion and installation of a new energy source based on gas turbine technologies were held at CHPP 1

The chief engineer of the project Anton Koloshin told the participants about the main tasks of the project. According to him, the main technical solutions for the reconstruction and expansion of the station are due to significant wear and tear of the main equipment and the expiration of the permissible service life of the existing steam boilers No. 8 en 11, steam turbines No. 9, 10 and two water heating boilers Article No. 1, 7. And also with the decision of the city hall to reduce the impact on the environmental situation of the metropolis. Expansion and transfer of CHPP 1 to the burning of natural gas as the main fuel will be carried out by installing gas turbine equipment and water heating and utilization boilers to cover thermal loads.
The implementation of the project is also of great social importance for residents of the adjacent district. After switching the station to natural gas as the main fuel, a decrease in emissions of harmful substances into the atmosphere in the city center is predicted. The impact on groundwater is significantly reduced. Thus, in addition to increasing the reliability and quality of heat supply, the comfort of living of the population is improved.
Part of the comprehensive reconstruction work will be the improvement and landscaping of the station. The territory of CHPP-1 will be allocated with green spaces to isolate individual premises from dust, harmful gases and industrial noise.
The project will be implemented until 2018.
After the official part, the chief engineer of the project gave detailed answers to the questions of interest.

Irina TULINOVA

TO BE REMEMBERED, A MEMORIAL PLAQUE IN MEMORY OF AITKALI ZHAKUTOV WAS INSTALLED AT THE CHPP-2 OF ALMATY ELECTRIC POWER PLANTS JSC

The entire career of Aitkali Zhakutov, an honorary power engineer of the USSR and an excellent student of energy and electrification of the USSR, was associated with the development of the Almaty energy system.

Aitkali Zhakutov started his work at Almaty CHPP-1 as an engineer, a master of the turbine shop, and an engineer on duty at the station.
In 1967, he became the director of the Almaty heating networks enterprise.
In 1973, Aitkali Zhakutovich was appointed manager of the district Energy Department (REU) of Alma-Ataenergo. In 1974, by a resolution of the Council of Ministers of the Kazakh SSR, he was approved as a member of the Board of the Ministry of Energy of the Kazakh SSR.
Aitkali Zhakutovich possessed high organizational skills and special responsibility for the assigned task. These qualities were clearly manifested during the performance of emergency recovery work in the area of the Medeo mudflow dam after the past mudflows in 1973. Then, for his dedication and successful organization of work, Aitkali Zhakutovich was awarded a diploma of the Supreme Council of the Kazakh SSR.
Under his leadership, heating systems were further developed in the cities of Almaty and Kapchagai. High-voltage lines have been put into operation, the construction of the Alma-Ata GRES and Kapchagai HPP has been completed. With the direct participation of Aitkali Zhakutovich, the construction and commissioning of the first stage of the Alma-Ata CHP-2 were carried out. This important energy facility has played a crucial role in reliable and uninterrupted energy and heat supply to consumers in Almaty and the region.
The name of Aitkali Zhakutovich is included in the encyclopedia of “Energy of Russia”.
At a solemn meeting in honor of the opening of the memorial plaque at CHP-2, energy veterans gathered, who, together with the management of JSC AlES, recalled life situations related to Aitkali Zhakutovich, his organizational skills and responsibility for the work done. The family of the honorary power engineer was also present at the meeting. Aitkali Zhakutovich’s children followed in their father’s footsteps and also connected their lives with energy.
Concluding their speech, the family members expressed gratitude for the recognition of Aitkali Zhakutovich’s services to society.

Irina TULINOVA

ALMATY ELECTRIC POWER PLANTS JSC: INVESTMENTS IN RELIABILITY AND QUALITY

Studying the activities of the production of electric energy in 2013, changes and additions to the agreement with the Mint of the Republic of Kazakhstan in 2014 were made. The volume of investment obligations of JSC “Ales” with the amount of changes is 6,779.5 million. tenge.

Almaty power plants JSC: investing in reliability and quality
In 2013, amendments and additions were made to the 2014 agreement with the Ministry of industry and new technologies of the Republic of Kazakhstan, taking into account the additional profit from electricity generation activities. The volume of investment liabilities of ales JSC, taking into account the changes made, amounted to 6,779.5 million. tenge

THE DECISION TO PAY DIVIDENDS ON COMMON SHARES BASED ON THE RESULTS OF 2013.

Joint-Stock Company “Almaty Electric Stations” issues a decision on the issue of dividends on common shares based on the results of 2013.

Joint-Stock Company “Almaty Electric Stations” announces the decision to pay dividends on common shares based on the results of 2013

AUDITED FINANCIAL STATEMENTS OF ALES JSC

Organization Name: Almaty Electric Power Stations JSC
Type of activity of the organization: Production of electricity and heat (40105)
Legal form: Joint-stock Company
Legal address of the organization: 7 Dostyk Ave., Almaty

 (thousand tenge)

Assets

December 31, 2013

December 31, 2012

Non-current assets
Fixed assets

63 634 331

61 222 662

Intangible assets

160 170

199 461

Other non-current assets

2 486 923

920 208

Total non-current assets

66 281 424

62 342 331

Current assets
Inventory management

6 558 649

6 471 084

Accounts receivable

4 517 657

5 756 343

Cash and cash equivalents

2 255 057

1 836 071

Overpayment of current corporate income tax

626 083

1 192 590

Total current assets

13 957 446

15 256 088

TOTAL ASSETS

80 238 870

77 598 419

CAPITAL
Share capital

30 212 475

30 212 475

Retained earnings

25 381 060

19 903 637

Other reserves  (155 963)
TOTAL EQUITY

55 437 572

50 116 112

COMMITMENTS
Non-current liabilities
Reserve for recovery of ash dumps

508 248

121 031

Employee benefit obligations

723 325

606 143

Deferred tax liabilities

3 125 332

1 944 219

Loans

8 277 072

9 159 534

Total non-current liabilities

12 633 977

11 830 927

Current liabilities
Reserve for recovery of ash dumps

–

244 059

Employee benefit obligations

43 155

31 750

Loans

6 247 991

2 993 315

Provisions for liabilities and expenses

68 000

135 507

Accounts payable

4 708 757

11 947 849

Other taxes payable

1 099 418

298 900

Total current liabilities

12 167 321

15 651 380

TOTAL LIABILITIES

24 801 298

27 482 307

TOTAL LIABILITIES AND EQUITY

80 238 870

77 598 419

STATEMENT OF COMPREHENSIVE INCOME

as of December 31, 2013

                                                                                       (thousand tenge)

2013.

2012.

Revenue

48 694 302

47 013 672

Cost of sales

 (40 400 278)

 (39 393 540)

GROSS PROFIT

8 294 024

7 620 132

General and administrative expenses

 (1 897 000)

 (1 787 430)

Other operating income

1 542 037

1 085 891

Other operating expenses

 (59 572)

 (187 423)

OPERATING RESULTS

7 879 489

6 731 170

Financial income

45 097

73 348

Financial expenses

 (872 213)

 (830 046)

PROFIT BEFORE TAX

7 052 373

5 974 472

Income tax expense

 (1 504 950)

 (1 270 302)

Profit for the year

 5 547 423

 4 704 170

Other comprehensive loss

 (155 963)

Other comprehensive loss for the year

 (155 963)

TOTAL COMPREHENSIVE INCOME FOR THE YEAR

5 391 460

4 704 170

 

CASH FLOW STATEMENT

as at 31 December 2013
(indirect method)

(thousand tenge)

Naming of indicators

2013.

2012.

Cash flow from operating activities
Profit before tax

7 052 373

5 974 472

Adjustments for:
Depreciation and amortisation

5 199 749

4 440 426

Loss on disposal of property, plant and equipment

21 061

148 800

Cost of current services

17 634

38 356

(Recovery)/accrual of provision for upcoming expenses and payments

 (67 507)

68 000

(Recovery)/accrual of inventory allowance

 (276 849)

 (156 000)

Reversal of provision for impairment of accounts receivable and other non-current assets

 (10 209)

 (1 561)

Financial expenses

872 213

830 046

Cash flows from operating activities before changes in working capital

12 808 465

11 342 539

Decrease/(increase) in accounts receivable

146 321

506 928

Decrease/(increase) in inventories

189 284

2 757 008

Decrease/(increase) in accounts payable

 (479 583)

 (4 399 961)

Increase/(decrease) in taxes payable

1 043 187

196 035

Employee benefits paid

 (78 691)

 (72 006)

Provisions paid for liabilities and expenses

 (970 000)

Cash generated from operating activities

13 628 983

9 360 543

Income tax paid

 (2 276 622)

Interest paid

 (901 690)

 (1 134 602)

Net cash generated from operating activities

12 727 293

5 949 319

Cash flows from investing activities
Purchase of fixed assets

 (14 591 817)

 (10 776 062)

Acquisition of intangible assets

 (4 803)

Short-term deposits with banks

 1 102 574

Proceeds from sale of property, plant and equipment

 81 680

Net cash used in investing activities

 (13 407 563)

 (10 780 865)

Cash flows from financing activities
Proceeds from the share issue

3 028 715

Loan receipts

7 141 809

9 342 759

Repayment of loans

 (4 772 553)

 (11 715 814)

Dividends paid to shareholders

 (1 270 000)

Net cash generated from financing activities

1 099 256

655 660

Net (decrease)/increase in cash

 418 986

 (4 175 886)

Cash and cash equivalents at the beginning of the year

1 836 071

6 011 957

Cash and cash equivalents at the end of the year

2 255 057

1 836 071

STATEMENT OF CHANGES IN EQUITY
at 31 December 2013

(thousand tenge)

Share capital

Other reserves

Retained earnings

Total

Balance as of January 1, 2012

27 183 760

16 399 467

43 583 227

Profit for the year

4 704 170

4 704 170

Share issue

3 028 715

3 028 715

Dividends declared

 (1 200 000)

 (1 200 000)

Balance as at 31 December 2012

30 212 475

19 903 637

50 116 112

Profit for the year

5 547 423

5 547 423

Other comprehensive income

 (155 963)

 (155 963)

Total comprehensive income for the year

 (155 963)

5 547 423

 5 391 460

Dividends declared

 (70 000)

 (70 000)

Result of transactions with a shareholder on non-market terms

0

Balance as at 31 December 2013

30 212 475

 (155 963)

25 381 060

55 437 572

Acting Chairman of the Management Board: Ismukhambetov G. Zh.

Chief Accountant: Zh. O. Nukusheva

INDEPENDENT AUDITOR’S REPORT

To the Shareholder and Board of Directors of Almaty Electric Power Stations JSC

We have audited the accompanying financial statements of Almaty Electric Power Stations JSC, which comprise the statement of financial position as at 31 December 2013, and the statements of profit or loss and other comprehensive income, changes in equity and cash flows for the year then ended, and notes, comprising a summary of significant accounting policies and other explanatory information. key accounting policies and other explanatory information.
Management’s responsibility for the financial statements
Management is responsible for the preparation and fair presentation of these financial statements in accordance with International Financial Reporting Standards, and for such internal control as management determines is necessary to enable the preparation of financial statements that are free from material misstatement, whether due to fraud or error.

Auditor’s responsibility
It is our responsibility to express an opinion on these financial statements based on our audit. We conducted our audit in accordance with International Standards on Auditing. Those standards require that we comply with ethical requirements and plan and perform the audit to obtain reasonable assurance about whether the financial statements are free from material misstatement.
An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the consolidated financial statements. The procedures selected depend on the auditor’s judgment, including the assessment of the risks of material misstatement of the financial statements, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity’s internal control. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion.

Opinion
In our opinion, the financial statements present fairly, in all material respects, the financial position of Almaty Electric Power Stations JSC as at 31 December 2013, and its financial performance and cash flows for the year then ended, in accordance with International Financial Reporting Standards.

February 20, 2014
Almaty, Kazakhstan

Approved and signed: Signed by:
Dana Inkarbekova Азамат Конратбаев
Managing Director Audit Partner
PricewaterhouseCoopers LLP (Institute of Chartered Accountants ACCA Certificate No. 00770863 dated May 8, 2003)
(General State License of the Ministry of Finance of the Republic of Kazakhstan No. 0000005 dated October 21, 1999)
Signed by:
Irina Taskaeva
Executive Auditor (Qualified Auditor’s Certificate No. 00000465 dated November 14, 1998)

THE GREEN BIAS OF COAL POWER

A third of the volume of investments of Almaty power plants JSC, aimed at modernization and development of production, will contribute to improving the ecology of the region.

Almaty goes to the West, in the direction of the village of Agabas-along a wide Road, New microdistricts are growing. Many – within the framework of the Affordable Housing Program. Floors are growing, roads have already been laid at the entrances to some houses, Almaty residents have a natural question, and when connecting communications, will the city cope with the growth of energy loads?
In fact, the answer to this question is given by Almaty Power Engineers. Almaty CHPP-2, located in algabas village, is ready to show the results of the investment program implemented in 2009-2013. In addition, journalists were invited to the station.
– In total, 59 billion tenge was invested in the projects of JSC” Almaty power plants”.449 million. tenge has been directed and mastered, – says Galym Zhanbyrshy, deputy chairman of the board for the development of ales. – Among them
20 billion. Invested in the development of CHPP-2. As a result, the total production of thermal energy by this station is 1 million tons per year. Increased to Gcal
To the surprise of the media, the tour of the largest Almaty station – which accounts for about 70% of the heat and electricity generated in Almaty and the Almaty region – began with ash piles. And this is not by chance: in general, up to 18% of investments were allocated for their construction. Considering that another 14% of the Investment Program funds are directed to conservation measures, it can be said that even coal energy, which is considered dirty, has a green surface.
-The project for ash dumps was developed by kazni ENERGOPROM,-explains Vladimir Bychkov, deputy director for capital construction of CHPP 2. – Here in a year 1 million. it is disposed of up to the Ashes. The applied combined ash-slag removal system allows us to solve the problem of ensuring environmental safety for at least 15 years – water, air and soil.
Almaty power engineers are traditionally asked the question of replacing CHPP-2 with low-ash coal or gas. The price of such a transition is considered high by both power engineers and economists. As explained by the Managing Director of CHPP 2 Bisembek Sabyrkulov, any of these options requires technical re-equipment, replacement of the main units corresponding to the raw materials. Given the importance of environmental issues, today the search for alternative coal suppliers for energy sources of JSC “Ales”continues. To this end, we are constantly working with leading organizations of Kazakhstan, Russia, Germany: kaznipienergoprom Institute LLP, KOTES OJSC, Sibenergomash OJSC, LANMEYER International GmbH. As for the transition to gas, the head of the Department of the agency for Almaty Dauren Zhandarbek noted that due to the cost of fuel, heat energy will rise twice as much. The path chosen by Ales is to increase the environmental friendliness of production, which is now the most optimal both from the point of view of the economy and from the point of view of a technological solution.
Another object launched at CHPP-2 is a boiler house. About 12 billion for the construction of this modern complex. tenge was invested. The boiler successfully spent the first winter season. As a result, the volume of heat supplied to consumers increased by 30% from CHPP-2. Another important effect, perhaps, you can not evaluate with any money – Environmental.
-Thanks to the construction of a new boiler room at this station, we filmed CHPP 1, which is located in the central part of Almaty,-explains Galym Sadvakasuly. – This has positively affected the environmental situation in the city center.
In the future, CHPP-2 has a huge development potential. The youngest of the ales facilities, the station will be able to provide an increase in the need for electricity and heat in the city and region. For example, only the reconstruction of fan coolers at CHPP-2 allowed to remove power restrictions and increase the volume of electricity production to 362.7 million tons per year. it allowed to increase kWh.
– We have developed a plan for the development of JSC” Ales”, – says the scientist Rainer. – Our new five-year program is planned until 2019. This is due to the increased energy needs of the region. So, we estimate the need for additional heat at 215 Gcal per hour. Construction and installation work on the eighth Boiler House has begun at CHPP-2. We connect pumps, buy new equipment, expand the thermal wiring of the station. The new program will provide heat and energy to the Universiade facilities and new residential complexes, which are now being built within the framework of the state program “affordable housing”. That is, we must put into operation in 2016. This process occurs sequentially: the feasibility study is completed, when it comes out of State expertise. The design institute immediately begins to develop design and estimate documentation with the issuance of working documentation. Well, we’re ready to go.

Alevtina Don, Almaty

THE PROBLEM OF HEAT IS ALWAYS RELEVANT

Progress in fulfilling investment obligations of AlES JSC for 2009-2013
Last week, a group of journalists got acquainted with the current state of the 2nd thermal power plant (CHPP-2) of Almaty Electric Power Stations JSC (AlES). The purpose is to get acquainted with the implementation of investment obligations of AlES JSC for 2009-2013.
In general, today JSC “AlES” is an energy-producing institution engaged in the production and provision of heat and electricity in Almaty and the Almaty region. According to the company, today 60-70 percent of appliances at energy-producing facilities that access it look worn out. In particular, the condition of installations at CHPP-1, CHPP-2, and Kaskad HPP requires replacement with modern equipment.
Nevertheless, during our visit to CHPP-2, the company’s management informed us about the work being done there, describing in detail how boiler houses and steam, hot water, and electrical equipment are being repaired, upgraded, and replaced with modern equipment. Even the newly built collector building is planned to be launched in the near future, with the beginning of the heating season. In addition, a new one will be added to the building where the former old boilers are located, which is also ready for the upcoming heating season. Magnetic pointers were installed at all three CHPPs, fans were overhauled, and cooling towers that drain salt water to produce salt were repaired.
It should be recalled that the press tour described how AlES JSC fulfills its investment obligations. According to correspondents, 31 percent of the funds are allocated for increasing production volumes, 3.1 percent for reducing production costs, 34 percent for maintaining the current state of production, 18 percent for the construction of an ash dump and 14 percent for environmental protection measures.
According to Galym Sadvakasovich, Deputy Chairman of the Management Board of AlES JSC for Production, Chief Engineer, in the near future, Winter Universiade facilities will be built near CHPP-2, which will be held in the city in 2017. In addition, other socially significant objects will be built near the city. That is, the goal here is to attract heat and light to them at close range. At the same time, according to Galys Sadvakasovich, smoke traps are installed in the giant twin towers where it smokes, and the amount of toxic gas released into the air is significantly reduced.
It is worth noting that at the initiative of the mayor of the city Akhmetzhan Yessimov, concerning the improvement of the ecological situation of the city, CHPP-1 switched to environmentally friendly fuel. However, you should also remember to be careful, and if severe cold weather occurs in winter, then coal and fuel oil are ready for it as an additional fuel.
It is very important that heat and electricity reach the city residents safely and there are no accidents. The work carried out in this direction on the annual repair of main and auxiliary devices has reduced the accident rate by up to 50%. Pumps and electric motors, devices that provide workplace comfort, and other small equipment that comes in for frequent replacement are also frequently updated.
The measures taken by the giant company, which includes three combined heat and power plants “Kaskad” and “Kapshagai”, have yielded results and will allow increasing production volumes in the future.
Thus, JSC “AlES” implements its investment commitments within the established time frame and successfully fulfills the prerequisites for uninterrupted heat supply and high-quality services to the population of the city and region in the coming winter.

Маншук БЕКБОСЫН