The main conservation measures in 2014
Protection of atmospheric air: 1.combustion devices, emulsifiers were reconstructed, anti-corrosion works were carried out, metal structures, pipes, worn surfaces were replaced, violations in the technological cycle were eliminated in the boiler units of CHPP-1, 2, 3.
Losses amounted to 337 million. “no,” he said.
2.work was carried out on the repair and replacement of PPE cubes, repair of assemblies and adjustment of equipment, mode adjustment of aspiration units, elimination of dust in ash dumps of CHPP-1, 2, 3.
Losses amounted to about 449 million. “no,” he said.
Protection and rational use of Water Resources:
1.at the boiler house, turbine, chemical shops, treatment facilities of CHPP-1, Ash pipelines, pumping equipment were repaired.
Losses amounted to about 99 million. “no,” he said.
2.restoration and repair of Hydrozolation systems, industrial systems, tanks of treated water reserves were carried out, measures were taken to reduce water losses during the transportation of ash and slag waste at CHPP-2.
Losses amounted to about 73 million. “no,” he said.
3.repair and replacement of worn – out fittings of auxiliary pumping equipment of CHPP-3 has been performed. Losses are about 3 million. “no,” he said. Work was carried out on the protection of land resources, rational use of subsurface resources, flora and fauna: restoration of the anti-filter screen, prevention of pollination, restoration of worn-out areas in the ash dumps of CHPP-1, 2, 3, hazardous waste of production and consumption and MSW were transferred for disposal to third-party organizations.
Losses amounted to about млн 2,842 million. “no,” he said.