Kapshagai Hydroelectric Power Station: built on a rocky outcrop
Back
11.02.2026

Kapshagai Hydroelectric Power Station: built on a rocky outcrop

It is said that the American war correspondent Martha Gellhorn – Ernest Hemingway’s third wife – travelled through a number of Soviet republics and, of all the cities in the country, singled out only the capital of Kazakhstan. If we are to believe oral accounts from journalists, she was so enchanted by Almaty that she described the city as ‘the purest green emerald set in a diamond frame of snow-capped mountain peaks’.

But the purest ‘emerald’ also required the purest energy. The existing capacity was already insufficient for the rapidly growing city. And in the mid – 1960s, the time came to expand Almaty’s energy infrastructure. This time, the choice fell on clean hydropower. The site – on the Ili River – was identified 461 kilometers from the mouth and 70 kilometers north of the capital of Kazakhstan, in the Kapshagai Gorge area.

The idea of building a hydroelectric power station on the Ili River was first put forward in his book ‘Technical and Economic Indicators of the Kapshagai Hydroelectric Power Station on the Ili’, published in 1942, by the renowned Kazakhstani energy scientist, President of the Academy of Sciences of the Kazakh SSR, founder and first director of the Kazakh Research Institute of Energy, Academician Shafik Chokin (Shokin). He subsequently substantiated the idea, drawing on research he had conducted between 1944 and 1950 into the possibilities for the comprehensive use of the waters of the Ili River and its energy potential. He demonstrated that the hydroelectric power station would be beneficial and profitable for Almaty and Kazakhstan.

The Kapshagai HPP was designed in 1959 by the Kazakh branch of the All-Union Design and Survey Institute ‘Gidroproekt’ named after S.Y.Zhuk and was further developed until 1964. Although different environmental standards were in force when the project was developed in the 1960s, the designers endeavored to integrate the facility as harmoniously as possible into the natural landscape.

The foundation stone for the station was laid personally by Dinmukhamed Akhmedovich Kunayev. A number of unique technical innovations were proposed for the station. In particular, the water conduit for the hydro-units was not built specifically from concrete. To this day, a natural rock outcrop serves this purpose. The dam was constructed from aeolian (fine-grained) sands, which significantly reduced its cost. This idea was implemented for the first time in global practice in an area with a seismic intensity of 7-8 on the Richter scale, where a 50-metre-high riverbed dam made of aeolian sands was constructed. The dam model withstood a magnitude of 9. A new type of turbine was also used here for the first time.

The general contractor for the Kapshagai HPP project was the ‘IrtyshHESstroy’ trust. The trusts ‘Gidrospetsstroy’, ‘Gidrospetsmontazh’ and ‘Gidromontazh’ were also involved in the construction and installation of the plant’s equipment. The construction of the plant was overseen by Asanbay Askarovich Askarov, First Secretary of the Almaty Regional Party Committee.

On 15 December 1970 at 2.15 am, generator No.1 was started on no-load operation. On 20 December of the same year, commissioning work was completed, and the director of the hydroelectric power station, Boris Gennadievich Osipov, connected the first generator of the Kapshagai Hydroelectric Power Station to the grid using the ‘manual precise synchronization method’.