AlES JSC received Certificates of readiness
In order to prepare for the 2024-2025 heating season, all enterprises of Almaty Electric Stations JSC have accumulated the necessary operational reserves of main and reserve fuel. To date, AlES JSC has carried out repairs and prepared a sufficient composition of energy source equipment necessary to meet heating needs during operation during winter maximum loads, taking into account backup boilers and turbines.
In accordance with the Law of the Republic of Kazakhstan “On Electric Power Industry”, Almaty Electric Stations JSC received passports confirming readiness to carry maximum loads in the autumn-winter period of 2024-2025, including:
Department of Energy and Water Supply of Almaty conducted a readiness check of the equipment of the Western Thermal Complex of AlES JSC and issued on September 25, 2024 The passport of readiness for work in the autumn-winter period of 2024-2025.
Atomic and Energy Supervision and Control Committee of the Ministry of Energy of the Republic of Kazakhstan conducted an inspection of the readiness of the equipment of the facilities of AlES JSC and on September 25, 2024 issued a Passport of readiness of energy-producing organizations to work in the autumn-winter period 2024-2025.