Information on realized projects in 2024 at the facilities of AlES JSC
WTC
In 2024, within the framework of the Investment Budget, a project to implement an automated emission monitoring system (AMS) was implemented at the Western Thermal Complex (WTC).
Implementation of an automated emission monitoring system (AMS) at waste management sources in accordance with the requirements of Clause 5, Clause 1 of Article 130 of the Environmental Code of the Republic of Kazakhstan, the Order of the Minister of Ecology, Geology, and Natural Resources of the Republic of Kazakhstan dated June 22, 2021, №208 “On Approval of the Rules for Maintaining the Automated Environmental Emission Monitoring System during Production Environmental Control,” and the Order of the Minister of Energy of the Republic of Kazakhstan dated September 7, 2018, №356.
To achieve this goal, construction and installation work was carried out to implement an automated emission monitoring system (EMS) on the chimneys of stations №1, 2, and 3 of the ZTK department by a consortium consisting of “ECOSERVICE-S” LLP together with “Infratech” LLP under contract №785909/2023/1 dated January 11, 2023, in accordance with the design and estimate documentation developed by “Renaissance Plus” LLP.
Gas analytical equipment and an automated information and measurement system for monitoring emissions of pollutants in outgoing gas pipelines, engineering support, networks, and systems have been installed. Installed ASM equipment:
Before


After



After
According to the investment budget for the CHPP-2 in 2024, work has begun on the capital repair of the main building’s roof.
Within the framework of the declared state of emergency (Decision of the Akim of the Alatau district of Almaty №3-r dated September 25, 2024), “AlES” JSC is carrying out emergency restoration work to overhaul the roof of the main building of the A.Zhakutov CHPP-2.
Major overhaul work is being carried out by the contractor “AsiaSpetsenergoMontazh” LLC under contract №1033160/2024/1 dated September 27, 2024, in accordance with the design and estimate documentation developed by “Bekem Project” LLC.
The project is being implemented due to the high wear and tear of roofs and is aimed at increasing the reliability and safe operation of the facilities. As part of the work, it is planned to replace roofing, restore structures, and install water and thermal insulation.
Before

After


CHPP-3 Ash dump, 5th stage
According to the investment budget for CHPP -3, a complex of works was completed in 2024 to reconstruct and expand the CHPP-3 ash dump. 5th shift
To increase the reliability of electricity and heat supply to consumers by ensuring the continuity of electricity and heat production, a set of measures is being implemented on the territory of CHPP-3 under the project “Reconstruction and expansion of the CHPP-3 ash dump.” 5th shift.
The technological solutions provide for the execution of construction and installation works for the development, transportation, and storage of ash and slag waste.
Construction and installation work was carried out by the contractor “Build Construction Group” LLC under contract No.934642/2024/1 dated January 30, 2024, in accordance with the design and estimate documentation developed by the Consortium as part of “BEKEM PROJEKT” LLC together with “StroyKom-2001” LLC.
Before

Process of work

After