Lines of history: Rafik Ismailovich GLYAMSHIN, before retiring, worked as shift supervisor at the Cascade Hydroelectric Power Plant
In 1958, after being demobilised, I came to Alma-Ata to visit my brother, a former officer. I liked the city and decided to stay here. I am originally from Saransk, then served in Kursk as an aircraft mechanic, servicing aeroplanes. After the army, I wanted to get a job at AZTM as an apprentice foundryman. I only had seven years of education, and I always believed that it was necessary to study. There was no other way, because my mother died early, and I raised myself from early childhood.

But instead of the factory, I got a job at Cascade, at HPP-1, and I really liked the station. For three months, I was an apprentice turbine operator and got my fourth grade. And when the commission found out that I was an aircraft mechanic, they said, “Why didn’t you say so? We would have given you your grade right away!”

Then I graduated from the Almaty Construction Technical School by correspondence, specializing in “power stations, substations, networks and systems”. It was not easy to study and work at the same time, especially considering that the bus only went as far as HPP-2, and then I had to walk to the city. There were even times when I walked from the city to HPP-1. Sometimes I was afraid in the mountains, so I hid some reinforcement bars somewhere along the way, just in case. But I endured everything and defended my diploma with honors.
In my third year, I was appointed master of electrical power equipment at HPP-1, and I also worked as a duty engineer and master. My mentor was the chief engineer, head of HPP-1, Heinrich Yuryevich Borodin. We were engaged in equipment repair and maintenance. At that time, about 25 people worked at the station – inspectors, duty engineers, masters of the turbine, mechanical and electrical parts, and watchmen. Later, I worked as a foreman at HPP-2, servicing two stations in turn, which were 7 km apart.
In other words, I had a specific area of responsibility at HPP-1 and HPP-2. I still remember well that HPP-1, which was launched in 1953, used Italian equipment, while HPP-2 used Uralmash generators. These stations are different. Even in terms of sound: Italian equipment is quieter, while HPP-2 is louder. A generator is a generator, but the Italian one is neatly and beautifully made.
All the stations had their own peculiarities. For example, the Japanese made the wooden pipelines at stations 6 and 7. At HPP-5, the equipment had to be repaired frequently because the generator there is vertical and always heats up poorly.
At HPP-1 and HPP-2, I did all the welding work myself. And when major repairs began, a special team would come. After the repairs, I would inspect their work. After all, if something broke, it was always your fault. So I tried to do the responsible work myself. It wasn’t easy, but it was more reliable.
We all had to know the equipment very well and pass exams: ‘Operation’ once every two years, ‘Safety’ every year. These requirements were strictly enforced. But despite my knowledge and experience, I was never shy about asking my senior colleagues for advice or help, and they always helped me.

So, at HPP-2, we monitored routine and major repairs. I had fitters, but overall there were few subordinates. There were assistants – electricians, mechanics. We mainly repaired electrical equipment ourselves, sawing and grinding by hand, and if we didn’t know something, we looked it up in textbooks and reference books. The repair program was drawn up in advance with senior management, and the necessary spare parts were ordered in advance.

In those days, facilities were constantly being modernised. For example, we installed newer electrical equipment at substations. During each professional inspection, we measured the contacts with a special device. Previously, the crane operator, the welder and I dismantled the generator ourselves. Each generator has protection that causes the device to shut down instantly in the event of an emergency so that it does not burn out. That is why we installed new ES-35s at HPP-1 and HPP-2 at the time. This means that 35,000 volts can be shut off when circuits break during short circuits. And there is only 0.1 seconds to save the equipment. The equipment must work correctly, and the automation must regulate it in different modes. And we must monitor the equipment so that there are no failures, because if it fails, the generator will burn out.
Working as an engineer, I was always in overalls – I couldn’t stand aside while others were working. And then it was my responsibility. I was always responsible for the equipment from repair to repair. I worked at Cascade for almost my entire life, so I knew every cable and where it belongs.
In 1985, I transferred to Gorvodokanal, but after working there for five years, I returned to The Cascade. The station is like home to me, because I started there as an apprentice. And what a great attitude they had towards their employees! Kaskad took good care of its employees’ housing needs. After ten years of service, they gave me an apartment, provided me with a turnkey house, and even allocated money for the purchase of a car. Every apartment had a free work phone. If something happened somewhere on the line or in the mountains, it was necessary to quickly convey the information and send specialists to the scene of the emergency.
Everything related to equipment repair and maintenance was thought out and planned in advance. We had a monthly work plan. Some equipment was repaired every year, and after six months, routine repairs were carried out. Every day, I did a general inspection in the morning, checking the instruments, insulation, and generators, and recording all the information, including defects, in a log.
Our team at Cascade was friendly. We always celebrated holidays together. Famous artists came to our village. We all lived happily and harmoniously: after work, we built a stadium ourselves and spent three years building a swimming pool. We also built an ice rink ourselves. I have always loved sports. And at Cascade, everything was there for that, there was even a medical centre – they cared about people.
In 1992, I was transferred to be on duty at all stations. So I was on duty at the control panel for 15 years. Quite a few different stories happened when I was on duty at the central control panel. Once, at 3 a.m., I was on duty when I got a call saying that there was a malfunction at HPP-5 that needed to be fixed.
I had a smoke and wanted to empty the ashtray, so I opened the door, and immediately people in masks with guns attacked me. These burly guys threw me to the floor and tied my hands. I asked, ‘What do you want?’ They replied, ‘We need the computers.’ They wanted to cut the telephone cable, so I said, ‘Don’t touch it, just take what you need.’
One held me at gunpoint while the other carried things away. They left, I found a knife, untied my hands, and then turned on the siren. The police arrived, but they didn’t find the criminals. For some reason, the bars had been removed. When you open the door, the alarm should go off, but there was no signal then. After that incident, I had a minor heart attack…
I am the only one in my parents’ family who works in the energy sector. My father stayed on the collective farm. I settled in Almaty and got married at the age of 22. My wife was a linguist and worked at a school as a teacher, deputy headmistress and headmistress… I have two sons and a daughter. My daughter is an economist. One of my sons graduated from technical college and became an energy engineer.
I now have a total of 48 years of work experience. I retired as the shift supervisor for the entire Cascade Hydroelectric Power Plant. Although I am retired, I still worked for seven years…