Atmospheric air protection: Work has been carried out to maintain the degree of purification of ash-collecting devices in the boiler units of the stations, repair and replacement of air heater cubes, repair of boiler burners, emulsifiers, anti-corrosion work has been carried out, metal structures, pipes, worn surfaces have been replaced, violations in the technological cycle at the boiler units of CHP-1, 2, 3, for dedusting the tract have been eliminated fuel supply.

The costs amounted to 383 million tenge.

Protection and rational use of water resources: Repair of ash pipelines, pumping equipment in boiler, turbine, chemical workshops, treatment plants of CHP-1 was carried out, measures were taken to reduce water losses during transportation of ash and slag waste to CHP-2 and CHP-3, repair of the recycling system for industrial purposes (bagernaya, cooling towers) at CHP-2.

The costs amounted to about 161 million tenge.

Protection of land resources, rational use of subsoil, flora and fauna: Work has been carried out to replace worn-out pipelines to prevent the spill of ash and slag waste and pulp, landscaping of territories of administrative-territorial units, increasing the area of green spaces, reclamation of degraded territories at CHP-1 and CHP-3, work on the inventory of the anti-filtration screen at CHP-2.

The costs amounted to about 269 million tenge.

Industrial and consumer waste management, radiation, biological and chemical safety: Work has been carried out on the reconstruction and expansion of ash dumps, solid household waste, mercury-containing lamps and other hazardous waste have been disposed of.