Solutions that actually work
Sometimes a single precise decision changes not only the technology but also the approach to work. At AlES, such solutions are born where production boils every day – in workshops, near equipment, in a dialogue between experience and responsibility.
At AlES JSC, rationalization has long since transcended the boundaries of individual initiatives. Here, this is part of professional thinking, where any improvement begins with a simple question: “How can we do better?”
“Rationalization work in AlES is not a one-time idea. This is a systematic approach that allows us to constantly increase production efficiency,” says Ilyas Seydigaliyev, Chief Specialist of the Technical Department. – Today, this is already part of our production culture. Every proposal is a contribution to the reliability, safety, and development of the station.

Such decisions are always born from practice. At the B.Orazbayev CHPP-1, one of the tasks remained the cleaning of peak boilers. The process required the involvement of contractors, took time, and reduced efficiency.
The “Energoremont” project team proposed their own option – to switch to mechanical cleaning using drills and water supply under pressure.
“Previously, cleaning was carried out by contracting organizations, which took longer. “Now we are doing it ourselves – faster and more efficiently,” says Manap Zhumagulov, senior master.
The solution made it possible to speed up the work, reduce costs, and take the process under full control. However, as experts themselves admit, the main effect lies in something else.
“When you see the result of your work, you realize that this is a contribution to the stable operation of the entire station”. This is the result of teamwork,” emphasizes Arshidin Kurbanov, lead engineer-constructor of the PTO of the Energoremont production enterprise.

A similar approach worked at the A.Zhakutov CHPP-2, where specialists analyzed the process of unloading half-cars. The remaining coal in the wagons led to repeated operations and a loss of time.
“When analyzing the equipment’s performance, we identified the reason for repeated operations and decided to change the design. This made it possible to increase the efficiency of the process,” explains Beglan Razkul, Deputy Head of the PTO.
After revision, the problem was resolved – the unloading began to occur from the first cycle.
“Previously, additional operations had to be performed. “Now the process proceeds from the first attempt – faster, simpler, and more reliable,” notes Shalkar Nurmukhanbetov, Deputy Head for Operation of the TTC.
Such decisions are not always visible from the outside, but they form the stability of the entire system. Behind each is attentiveness, a professional perspective, and a readiness to take responsibility.
Rationalization in AlES is not about individual ideas. It is about people who daily look for opportunities to improve the process and lead them to results.
And that is precisely why solutions that actually work appear here.