Reconstruction of facilities in 2014

Reconstruction of facilities in 2014

Almaty power plants JSC for 2014

Results of implementation of investment obligations

“In accordance with the signed agreement”” on investment obligations “”with the Ministry of energy of the Republic of Kazakhstan for 2014, JSC “”Ales “” will receive млрд 18.0 billion in terms of replacement, modernization, restructuring, Technical re – equipment, new construction, as well as maintaining the current level of production.”measures were carried out in the amount of tenge, including at the expense of own funds-9.4 billion rubles. tenge, at the expense of borrowed funds-8.6 billion tenge. tenge. As part of the implementation of investment obligations, the following main activities were carried out:

Construction of own water pond at CHPP-1 (Stage 2)

rekonstrykcia 2014 1

rekonstrykcia 2014 2

Construction of own water pond CHPP-2

rekonstrykcia 2014 3

rekonstrykcia 2014 4

Restructuring of the CHPP-1 Water Treatment Plant (VPU)

rekonstrykcia 2014 5

rekonstrykcia 2014 6

rekonstrykcia 2014 7

Modernization of fuel devices of boiler units of CHPP-2

rekonstrykcia 2014 8

Restructuring of CHPP-2 CRU-0.4 KV equipment;

rekonstrykcia 2014 9

Reconstruction of technological control systems for turbine unit No.6 of CHP-2

rekonstrykcia 2014 9

CHPP-2 No. 6 St. restructuring of the technological control system for turbojet engines

rekonstrykcia 2014 11

Reconstruction of CHPP-3 with replacement of carbon receivers No. 2

rekonstrykcia 2014 12

rekonstrykcia 2014 13

rekonstrykcia 2014 14

Reconstruction of operational gutter No. 2 of kapshagai HPP with restoration of the concrete foundation of the tunnel

rekonstrykcia 2014 15

Cleaning of the channel in the lower section of the kapshagai hydroelectric power station

rekonstrykcia 2014 16

Reconstruction of garage boxes with seismic reinforcement of the construction of kapshagai hydroelectric power station buildings

rekonstrykcia 2014 17

Restructuring of relay protection and automation devices of HPP-5 cascade of HPP

rekonstrykcia 2014 18

Restructuring of the power supply of the CTRP with the replacement of cable lines

rekonstrykcia 2014 19

rekonstrykcia 2014 20

Restructuring of gas supply in the YUZRK and NZK

rekonstrykcia 2014 21

rekonstrykcia 2014 22