Reconstruction of facilities in 2014
Almaty power plants JSC for 2014
Results of implementation of investment obligations
“In accordance with the signed agreement”” on investment obligations “”with the Ministry of energy of the Republic of Kazakhstan for 2014, JSC “”Ales “” will receive млрд 18.0 billion in terms of replacement, modernization, restructuring, Technical re – equipment, new construction, as well as maintaining the current level of production.”measures were carried out in the amount of tenge, including at the expense of own funds-9.4 billion rubles. tenge, at the expense of borrowed funds-8.6 billion tenge. tenge. As part of the implementation of investment obligations, the following main activities were carried out:
Construction of own water pond at CHPP-1 (Stage 2)
Construction of own water pond CHPP-2
Restructuring of the CHPP-1 Water Treatment Plant (VPU)
Modernization of fuel devices of boiler units of CHPP-2
Restructuring of CHPP-2 CRU-0.4 KV equipment;
Reconstruction of technological control systems for turbine unit No.6 of CHP-2
CHPP-2 No. 6 St. restructuring of the technological control system for turbojet engines
Reconstruction of CHPP-3 with replacement of carbon receivers No. 2
Reconstruction of operational gutter No. 2 of kapshagai HPP with restoration of the concrete foundation of the tunnel
Cleaning of the channel in the lower section of the kapshagai hydroelectric power station
Reconstruction of garage boxes with seismic reinforcement of the construction of kapshagai hydroelectric power station buildings
Restructuring of relay protection and automation devices of HPP-5 cascade of HPP
Restructuring of the power supply of the CTRP with the replacement of cable lines
Restructuring of gas supply in the YUZRK and NZK