Main environmental activities for 2013

Main environmental activities for 2013

Atmospheric Air Protection:

1. Modernization of burner devices at boiler units of the CHPP-1 department, in order to meet the level of emissions of nitrogen oxides to the requirements of the Technical Regulation.

Planned expenditures 348.6 mln. tenge.

2. Implementation of measures to reduce and maintain emission levels, in accordance with the requirements of the Technical Regulation on boiler units of CHP-2,

3. Planned costs 701.5 mln. tenge.

Water conservation and management:

1. At CHPP-1: implementation of measures for the repair of ash pipes, pumping equipment in the boiler, turbine, chemical workshops, treatment facilities.

Planned expenditures 149.6 mln. tenge.

2. At CHPP-2: restoration and repair of the hydro-soluble system, production systems, storage tanks of clarified water.

Planned expenditures 205.6 mln. tenge.

Protection of land resources:

1. At CHPP-1: combined ash-coating system.

Planned expenditures 200.0 mln. tenge.

2. At CHPP-2: repair and restoration work on the ash.

Planned expenditures 4. 147.4 million tenge.