The following main environmental protection activities are planned for 2022, including:

– Protection of atmospheric air:

It is planned to maintain the degree of cleaning of ash-holding devices in the boiler units of stations, repair and replacement of cubes of air heaters, repair of burners, emulsifiers of boiler units, anti-corrosion work, measures to replace metal structures, pipes, worn heating surfaces, measures to increase efficiency, eliminate violations in the technological cycle in boiler units, dust cleaning of roads fuel supply, regime and adjustment works in boiler units, CHP aspiration units-1, 2, 3. Within the boundaries of the sanitary protection zone of all production departments, it is planned to carry out Emission Monitoring and impact monitoring and implement measures to save energy and fuel.

Planned expenses amounted to млн 627 million. tenge.

¡On the protection and rational use of Water Resources:

It is planned to repair and replace ash pipelines, pumping equipment in boiler houses, turbine, chemical shops, treatment facilities of CHPP-1, reduce water losses during the transportation of ash and slag waste at CHPP-2 and CHPP-3, repair the circulation system for industrial purposes (bagernaya, gradirni) at CHPP-2, sanitary and microbiological studies of water samples at Kapshagai HPP. It is planned to implement measures to save water.

Planned expenses amounted to млн 110 million. tenge.

¡ On the protection of land resources, rational use of subsoil, flora and fauna:

To prevent the spillage of ash and slag waste and pulp, it is planned to replace worn-out pipelines, green the territories of administrative-territorial units, increase the area of green plantings at CHPP-1, reclamation of worn-out territories at CHPP-2, CHPP-3.

Planned expenses amounted to 36 million. tenge.

♠ Handling of production and consumption waste, radiation, biological and chemical safety:

Measures are planned to prevent pollination of ash dumps at CHPP-1, 2, 3, transfer waste paper, solid household waste, mercury-containing lamps and other hazardous waste from the Departments of CHPP-1, 2, 3, BTK, Kapshagai HPP, Cascade HPP, IPC “Energy repair”for disposal.

Planned expenses amounted to млн 145 million. tenge.

 

In 2022, it is planned to hold an environmental challenge on waste paper ” to pack the second life!”and well – equipped batteries – “”save on batteries””, < / strong> environmental action < strong> “”Watch Earth””.”

 

Field actions are planned to clean up the pokhodnaya River, plant trees on the territory of the sanitary protection zone of production departments.