Completed environmental protection measures for 2021

Completed environmental protection measures for 2021

In 2021, the following planned environmental protection measures were implemented:

– Protection of atmospheric air:

Maintenance of the degree of purification of ash-trapping devices in the boiler units of stations, repair and replacement of cubes of air heaters, repair of burners of boiler units, emulsifiers, anti – corrosion works were carried out, metal structures, pipes, worn heating surfaces were replaced, measures were introduced to increase efficiency, violations in the technological cycle in boiler units were eliminated, work was carried out to dust the fuel Emission monitoring and impact monitoring were carried out within the boundaries of the sanitary protection zone of all production departments.

Losses amounted to about 667.2 million. “no,” he said.

¡On the protection and rational use of Water Resources:

Repair of pumping equipment was carried out in the boiler room, turbine, chemical shops, treatment facilities of CHPP-1, measures were carried out to reduce water consumption and inventory during the transportation of ash and slag waste at CHPP-2 and CHPP-3, repair of the circulation system for industrial purposes (bagernaya, gradirni) at CHPP-2, sanitary and microbiological studies of samples of water to Kapshagai HPP were carried out.

Losses amounted to about 1 178.4 million. “no,” he said.

¡ On the protection of land resources, rational use of subsoil, flora and fauna:

To prevent the spillage of ash and slag residues and cellulose, work was carried out to replace worn-out pipes, landscaping the territories of administrative-territorial units, increasing the area of green plantings at CHPP-1, restoring worn-out areas at CHPP-2 and CHPP-3, laying a protective layer of loam at the top of the row, strengthening slopes by sprinkling for the installation of a work on soil preparation. Construction and arrangement of a site for temporary storage of production and consumption waste was carried out in the CRC.

Losses amounted to about 776 million. “no,” he said.

♠ Handling of production and consumption waste, radiation, biological and chemical safety:

At CHPP-2, work was carried out on the reconstruction and expansion of the ash dump, work was carried out to prevent pollination of the combined ash slag disposal system at CHPP-1, 2, 3, solid household waste, mercury containing lamps and other hazardous waste from CHPP-1, 2, 3, BTC, Kapshagai HPP, Cascade HPP, VHRs departments were handed over for disposal “Energy repair”.

Losses amounted to about 2,196 million. “no,” he said.

In 2021, the program ” Show culture-hand over waste paper!”- the campaign for the collection and transfer of waste paper, which began on May 1, 2021, was handed over for recycling 5.5 tons of paper and cardboard unsuitable for use and ” Razzryad!”- the campaign for the transfer of used household batteries began on March 1, 2021, 65 kilograms of household batteries were handed over.

On June 4, 2021, a field action dedicated to the World Environment Day was held with the participation of production departments and all responsible environmentalists of the head office. According to the results of the campaign, 30 garbage bags of 35 liters were collected.