Available thermal power of CHP-3
Almaty Electric Power Plants JSC includes the production department of CHP-3, located in the village ofOtegen Batyr, the installed thermal capacity of CHP-3 is 335 Gcal/hour. The actual average annual thermal load of CHP-3 is 10.9 Gcal/hour, based on the calculated temperature (-27°C) the thermal load will be 60.4 Gcal/hour. As of 01.04.2025, the reserve of available thermal power is 274.6 Gcal/hour.