Few people know what a huge role the “Energoremont” Production and Repair Enterprise played in preserving the Almaty energy complex in the 90s. Many remember the 90s with fan-shaped outages and power outages. And PPP employees remember what efforts were required to restore energy supply and, in general, to maintain the operability of the Almaty energy complex during the period of a large country’s collapse and the severance of production ties.

The PRP was established in 1980 in accordance with Order No. 98, signed by the manager of the “Alma-Ataenergo” REU, Aitkali Zhakutov. The enterprise was included as a separate structure with the rights of a legal entity in the “Alma-Ataenergo” RSEH.

Initially, there were areas for repairing boiler and turbine equipment, grates, and an electrical section at TPP-1. Repair work was carried out only at TPP-1. As the department developed, its capabilities expanded, and the volume and complexity of the work performed grew. But before the collapse of the Union, there were large repair enterprises in the energy sector, such as “SredAzEnergoremont”, “CenterKazEnergoremont”, “SevKazEnergoremont”, and “YuzKazEnergoremont”. They had a serious base of machine tools, equipment, tools, qualified personnel, and most importantly, training plants where they trained employees for their units. Necessary parts for repairs and the maintenance of energy facilities were also manufactured there.

When, after the collapse of the USSR, the decline of repair organizations began, it was the PRP that took on all the volumes of work on the Almaty energy complex that were previously performed by third-party organizations. It was decided not to divide the PPP into power plants, but to create a single enterprise that would ensure the repair of all equipment at the power plants. The enterprise’s personnel could be sent to any of the stations, which also accelerated repair and restoration work.

But in the 90s, a large outflow of specialists began. The enterprise operated with old spare parts stocks that were rapidly depleting. There was practically nowhere to fill them. Much was restored thanks to the skilled workers of the PRP. Only over time was it possible to establish ties with the companies “Sverdlovenergo” and “Leningradenergo”, where spare parts and components could be selected for Soviet equipment. “I went there and gained experience in replacing old parts and equipment, determining which appliances are needed for repairs, etc”. Over time, we acquired balancing, optical, and laser machines. We invited experienced engineers from Leningrad to teach us”, recalled Amanzhol SHAGRAEV, a worker at the PRP section of the CHPP-2 turbine workshop in the 90s. – There were many emergency situations during that period. And for such emergency situations, we had duty buses. One cold winter, the smoke extractor broke down. The thick lubricant (litol, solidol) froze. No matter how much it was compacted, dust and ash still entered. And I asked the guys to balance it, and the bearing housing was rebuilt… for liquid oil. The exploiters have launched it. The redesigned building worked so quietly that almost no one heard it.

And there were many such cases where, thanks to the professionalism of the personnel, the work ingenuity, and the engineering thinking of the PRP team, it was possible to maintain the stations in working condition. Over time, the PRP was able to ensure the maneuverability of repair and technical maintenance and repair of all equipment. This allowed for the stable operation of the Almaty energy complex.